AU-5: Response To Audit Processing Failures
Generated
2019-05-20 15:48:11.984914
Status
Skipped
Statements
The information system:
Code | Description |
---|---|
AU-5a. | Alerts [Assignment: organization-defined personnel or roles] in the event of an audit processing failure; and |
AU-5b. | Takes the following additional actions: [Assignment: organization-defined actions to be taken (e.g., shut down information system, overwrite oldest audit records, stop generating audit records)]. |
STIG
STIG # | Description | Result |
---|---|---|
V-72893 | PostgreSQL must provide an immediate real-time alert to appropriate support staff of all audit failure events requiring real-time alerts. | skipped |
V-73023 | The system must provide a warning to appropriate support staff when allocated audit record storage volume reaches 75% of maximum audit record storage capacity. | skipped |
Additional Guidance
Audit processing failures include, for example, software/hardware errors, failures in the audit capturing mechanisms, and audit storage capacity being reached or exceeded. Organizations may choose to define additional actions for different audit processing failures (e.g., by type, by location, by severity, or a combination of such factors). This control applies to each audit data storage repository (i.e., distinct information system component where audit records are stored), the total audit storage capacity of organizations (i.e., all audit data storage repositories combined), or both.